Implementation Plan
Planning and Allocating Tasks Among Team Members
Implementation plan was based on a fluid and cooperative team approach, with very limited specialization of individuals or subgroups in particular tasks or skill groups. This decision was based on the following factors:
- Telescoped time frame for project completion/Large number of workstations: In order for the project to go forward, many of the tasks needed to be handled in a matter of hours and required all possible hands.
- Scheduling complications of a large group: Due to inevitable schedule conflicts of seven individuals, group members had to be prepared to work with other available team members on whatever task was most pressing
- Dynamic input/feedback from in-house technology staff: Because workflow configuration at the lab depended on changeable input from Art and Don, team members needed to be prepared to adapt.
Task Schedule
Members of the team were present at LC, pursuant to project needs and to the schedules of LC staff (who needed to be present). Main hours of work were Monday AM, Tuesday AM, Friday PM, Saturday, and Sunday (see schedule provided in appendix).
|
|
|
Target Completion Week | Team Members Responsible |
|---|---|---|---|---|
| Unpacking of computers | 8 | 9 | 9 | Cassandra, Natalie, Logan, Erin |
| Basic test of viability of computers and hubs | 8 | 9 | 9 | Everybody |
| Removal and documentation of hard drives | 7 | 9 | 9 | Cassandra, Everybody |
| Testing and setup of electrical power | 10 | 9 | 10 | Cassandra, Natalie, Logan, Erin |
| Labeling of computers | 7 | 9 | 9 | Cassandra, Erin, Everybody |
| Design of network schematic | 10 | 10 | 12 | Logan, Josh, Randy, Everybody |
| Initial assessment of cabling needs | 10 | 10 | 11 | Cassandra, Logan |
| Cleanup of ceiling/excess cables | 8 | 10 | 12 | Everybody |
| Cable making and testing | 10 | 10 | 12 | Josh, Mark, Everybody |
| Implementation of network plan | 10 | 10 | 11 | Logan, Randy, Cassandra, Everybody |
| Configure server cabinet | 10 | 9 | 12 | Everybody |
| Testing of network connections | 9 | 10 | 12 | Natalie, Mark, Everybody |
| Copying of image onto hard drives | 10 | 11 | 12 | Everybody |
| Restoration of hard drives to original locations | 10 | 11 | 12 | Everybody |
| Enclosure of cables and cleanup | 8 | 10 | 12 | Everybody |
Weekly Breakdown of Tasks
Week 9
- Meet with Art Hughes (AH) to clarify and coordinate plan (10/16)
- Unpack, arrange and begin testing computers.
- Remove and process hard drives, record serial numbers
- Assessment of electrical supply, and arrangement of cords/adapters.
- Initial attempt at image
- Discussion with AH about problem of noise from server, extracting cable from the ceiling, and setup of first five computers
Week 10
- Continue attempt at image
- Initial networking plan
- Calculation of cabling needs
- Continued testing of NIC cards and hubs
- Making cables for center island
- Begin process of trimming excess cables on door wall.
- Investigate connection between hubs
Week 11
- Continue trimming cables
- Continue cable assessment
- Making cables for window row
- Begin duping of image (incl. moving of jumpers) using provided disks
- Begin attaching labels to cables, matching workstation number
Week 12
- Continue duping
- Finish cable function confirmation
- Continue cleanup
- Wrapup meeting with AH